Building From October 2005October 2005
The roof is completed. The scaffolding has all been taken down but drainage down pipes have still to be fitted. Concreters, plasterers, electricians and plumbers are all going in and out of the building like a huge army of ants.
Love the extra wide corridors and the large buggy park. (Great for a race track.)
There won't be any queues here.
Large light and airy with good views.
One thing this photo does not show is how in this scheme the kitchen opening is offset to the lounge. Looks good. Another great feature is a waist level oven and hob. No more bending.
The only problem with this flat is that the view is obscured by trees. The branches practically touch the windows.
Pages that link to this page: Diary Of Events 2005 |
|
|
| Contributed Comments Building From October 2005 |
|
| There are no user contributed comments for this page. | |